In preparation for delivery to the Canadian Forces, our first CC-130J Hercules rolled out of a Georgia paint facility on Jan. 12, 2010.
It took 17 painters 12 days - and 283 litres of paint - to wash, prime and paint the Hercules. At 97 feet in length,
Why do you say that, Canada has been running the C-130E/H model which the J model supercedes. It's just one step up the ladder for an aircraft due to be replaced.
Forgive my failing memory, but I'm sure the airframes are more than 40 years old. They've just been stripped, and refurbed to be the 'Hotel' model by Spar Aerospace to give them a decade or more extended use.
Why do you say that, Canada has been running the C-130E/H model which the J model supercedes. It's just one step up the ladder for an aircraft due to be replaced.
Yes, but they are still ancient. The E's were bought in the late 60s and the H's (designed in '74) in the early 80s. The E's are so old that they already retired 6 airframes.
No, given that it is our air force's mainstay, we should have bought new Hercs to replace the E's sometime after 9/11 at the latest.
Why do you say that, Canada has been running the C-130E/H model which the J model supercedes. It's just one step up the ladder for an aircraft due to be replaced.
Forgive my failing memory, but I'm sure the airframes are more than 40 years old. They've just been stripped, and refurbed to be the 'Hotel' model by Spar Aerospace to give them a decade or more extended use.
Gotchya....